Thursday, March 27, 2014

The Build - Stage 20 Bathrooms

Now it's time for the bathrooms.  Here is the kids bathroom sink!


It will rest on top of this cabinet.



The gravel helps hold together the cement, making concrete.



Here is the shower drain and concrete installed.



This is the sand fill that went under the rubber sheeting.




This is the rubber sheeting that will go on top of the concrete in the shower.



Here is the rubber sheeting installed.  This stops any leaks, preventing mold.


Our customized faux basin will be covered with an industrial sealant.

No comments:

Post a Comment